April 2016 Photos
- Jim and Cal conferring on the radius to the hidden track Jim and Cal conferring on the radius to the hidden track
- Bob working on the Ispheming yard Bob working on the Ispheming yard
- Cal doing more work on the hidden track Cal doing more work on the hidden track
- Ken working on more trees Ken working on more trees
- April 26, 2016 Rob installing Totoise Switch April 26, 2016 Rob installing Totoise Switch
- Rob again repairing a handmade turnout. Rob again repairing a handmade turnout.
- April 18, 2016 Ken painting the layout's first trees. April 18, 2016 Ken painting the layout's first trees.
- Cal working on Hidden Track Cal working on Hidden Track
- One half of the Internatioal RR Bridge. One half of the Internatioal RR Bridge.
- Rob working on approach to International Bridge. Rob working on approach to International Bridge.
- Present Prez briefing past Prez on Proposed Layout. Present Prez briefing past Prez on Proposed Layout.
- April 11, 2016 Marv critiqueing Rob's Work April 11, 2016 Marv critiqueing Rob's Work
- Getting the perspective Getting the perspective
- Laying Ties on Scratch Built Turnouts Laying Ties on Scratch Built Turnouts
- Cutting Access Port Cutting Access Port
- Benchwork Maze Benchwork Maze
- Apr. 4, 2016 Master Landscape Painter Apr. 4, 2016 Master Landscape Painter
View the embedded image gallery online at:
http://rmrrc.org/joomla30/index.php/superior-northern/8-construction/23-2016-04-april#sigProId00d5c2eccd
http://rmrrc.org/joomla30/index.php/superior-northern/8-construction/23-2016-04-april#sigProId00d5c2eccd